VGSI AL-FORM

Setting Process

Modular Formworks are designed with standard panels to reduce cutting of materials on site, thereby requiring less labour on site.

VGSI AL-FORM

Setting Process

01
Marking
02
Rebar works for wall
03
Oiling wall panels
04
Setting wall panels
05
Setting S/L and beam panels
06
Setting slab panels
07
Setting staircase
08
Numbering panels
09
Oiling on the slab
10
Rebar works for slab
11
Concrete Casting
12
Dismantling panels